FRONT STREET over CONRAIL
Map
Coordinates:
+39.99486, -75.1300539°59'41" N, 75°07'48" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | FRONT STREET over CONRAIL |
| Structure number: | 677301001001350 |
| Location: | N.CAMBRIA STREET 29A04 |
| Purpose: | Carries highway and pedestrian walkway over railroad |
| Route classification: | Collector (Urban) [17] |
| Length of largest span: | 97.1 ft. [29.6 m] |
| Total length: | 102.0 ft. [31.1 m] |
| Roadway width between curbs: | 38.1 ft. [11.6 m] |
| Deck width edge-to-edge: | 52.5 ft. [16.0 m] |
| Vertical clearance below bridge: | 19.7 ft. [6.0 m] |
| Skew angle: | 34° |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 1985 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Main span material: | Steel [3] |
| Main span design: | Girder and floorbeam system [03] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 6,600 [as of 1978] |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 70.8 tons [64.4 metric tons] |
| Inventory rating: | 45.9 tons [41.7 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 93.7 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $2,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 6,600 [as of 1978] |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 70.3 tons [63.9 metric tons] |
| Inventory rating: | 45.5 tons [41.4 metric tons] |
| Sufficiency rating: | 97.4 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $2,485,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 6,600 [as of 1978] |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 18.6 tons [16.9 metric tons] |
| Inventory rating: | 12.4 tons [11.3 metric tons] |
| Sufficiency rating: | 63.6 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $1,656,000 |