SEDGLEY AVENUE over CONRAIL

Map 

Coordinates:
+40.00262, -75.14285
40°00'09" N, 75°08'34" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:SEDGLEY AVENUE over CONRAIL
Structure number:677301007002330
Location:WEST SEVENTH ST. 28J03
Purpose:Carries highway and pedestrian walkway over railroad
Route classification:Minor Arterial (Urban) [16]
Length of largest span:65.0 ft. [19.8 m]
Total length:66.9 ft. [20.4 m]
Roadway width between curbs:34.5 ft. [10.5 m]
Deck width edge-to-edge:60.0 ft. [18.3 m]
Vertical clearance below bridge:16.4 ft. [5.0 m]
Owner:City or Municipal Highway Agency [04]
Year built:1907
Historic significance:Historical significance is not determinable at this time [4]
Main span material:Steel [3]
Main span design:Girder and floorbeam system [03]
Deck type:Closed Grating [4]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:6,300 [as of 1979]
Deck condition:Fair [5 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Serious [3 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:31.9 tons [29.0 metric tons]
Inventory rating:16.9 tons [15.4 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:31.6
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,000

2000 Inspection 

Status:Posted for load [P]
Average daily traffic:6,300 [as of 1979]
Deck condition:Fair [5 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Serious [3 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:31.7 tons [28.8 metric tons]
Inventory rating:16.8 tons [15.3 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:34.7
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$745,000

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:6,300 [as of 1979]
Deck condition:Fair [5 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Good [7 out of 9]
Operating rating:32.2 tons [29.3 metric tons]
Inventory rating:21.0 tons [19.1 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:49.8
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$683,000