GOWEN AVENUE over SEPTA (CHEST HILL E BR)
Map
Coordinates:
+40.06491, -75.1905540°03'54" N, 75°11'26" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | GOWEN AVENUE over SEPTA (CHEST HILL E BR) |
| Structure number: | 677301019001570 |
| Location: | E.GERMANTOWN AVE 17B05 |
| Purpose: | Carries highway and pedestrian walkway over railroad |
| Route classification: | Local (Urban) [19] |
| Length of largest span: | 37.1 ft. [11.3 m] |
| Total length: | 37.1 ft. [11.3 m] |
| Roadway width between curbs: | 32.2 ft. [9.8 m] |
| Deck width edge-to-edge: | 58.1 ft. [17.7 m] |
| Vertical clearance above deck: | 16.4 ft. [5.0 m] |
| Vertical clearance below bridge: | 16.4 ft. [5.0 m] |
| Skew angle: | 1° |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 1932 |
| Year reconstructed: | 2001 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Main span material: | Prestressed concrete [5] |
| Main span design: | Box Beam or girders - Single or Spread [06] |
| Deck type: | Closed Grating [4] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Posted for load [P] |
| Average daily traffic: | 4,250 [as of 1999] |
| Deck condition: | Excellent [9 out of 9] |
| Superstructure condition: | Excellent [9 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 92.8 tons [84.4 metric tons] |
| Inventory rating: | 43.9 tons [39.9 metric tons] |
| Sufficiency rating: | 90.8 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $1,000 |
2000 Inspection
| Status: | Posted for load [P] |
| Average daily traffic: | 3,100 [as of 1981] |
| Deck condition: | Poor [4 out of 9] |
| Superstructure condition: | Poor [4 out of 9] |
| Substructure condition: | Poor [4 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 51.5 tons [46.8 metric tons] |
| Inventory rating: | 24.8 tons [22.5 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 42.0 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $960,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 3,100 [as of 1981] |
| Deck condition: | Poor [4 out of 9] |
| Superstructure condition: | Serious [3 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Operating rating: | 60.6 tons [55.1 metric tons] |
| Inventory rating: | 33.4 tons [30.4 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 31.6 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $535,000 |