Share:

GERMANTOWN AVE over WISSAHICKON CREEK

Map 

Coordinates:
+40.08431, -75.22794
40°05'04" N, 75°13'41" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:GERMANTOWN AVE over WISSAHICKON CREEK
Structure number:677301101001410
Location:S.NORTHWESTERN AVE.16G01
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:118.1 ft. [36.0 m]
Total length:316.0 ft. [96.3 m]
Roadway width between curbs:36.1 ft. [11.0 m]
Deck width edge-to-edge:47.6 ft. [14.5 m]
Skew angle:11°
Owner:City or Municipal Highway Agency [04]
Year built:2003
Historic significance:Bridge is possibly eligible for the National Register of Historic Places [3]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:9,500 [as of 1980]
Deck condition:Excellent [9 out of 9]
Superstructure condition:Excellent [9 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:77.9 tons [70.8 metric tons]
Inventory rating:46.9 tons [42.6 metric tons]
Sufficiency rating:95.5
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$1,000

2000 Inspection 

Status:Posted for load [P]
Average daily traffic:9,500 [as of 1980]
Deck condition:Serious [3 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Poor [4 out of 9]
Channel protection:Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. [4]
Scour condition:Bridge is scour critical; field review indicates that extensive scour has occurred at bridge foundations. [2]
Operating rating:67.3 tons [61.2 metric tons]
Inventory rating:38.6 tons [35.1 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:44.6
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$1,170,000

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:9,500 [as of 1980]
Deck condition:Poor [4 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Serious [3 out of 9]
Channel protection:Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. [4]
Operating rating:49.5 tons [45.0 metric tons]
Inventory rating:27.3 tons [24.8 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:44.5
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$1,431,000