RAMP B S.B. OFF over ARAMINGO AVENUE

Map 

Coordinates:
+39.97293, -75.12344
39°58'23" N, 75°07'24" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:RAMP B S.B. OFF over ARAMINGO AVENUE
Structure number:678011050003600
Location:GIRARD AVE.INTERC. 29B08
Purpose:Carries highway over highway
Route classification:Collector (Urban) [17]
Length of largest span:112.9 ft. [34.4 m]
Total length:984.0 ft. [299.9 m]
Roadway width between curbs:25.9 ft. [7.9 m]
Deck width edge-to-edge:31.5 ft. [9.6 m]
Vertical clearance below bridge:16.4 ft. [5.0 m]
Skew angle:99°
Owner:State Highway Agency [01]
Year built:1971
Year reconstructed:1984
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:5
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Latex Concrete or similar additive [3]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:47 [as of 2010]
Truck traffic:7% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:59.8 tons [54.4 metric tons]
Inventory rating:36.0 tons [32.7 metric tons]
Sufficiency rating:89.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$1,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:42 [as of 2000]
Truck traffic:7% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:62.4 tons [56.7 metric tons]
Inventory rating:36.6 tons [33.3 metric tons]
Sufficiency rating:87.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:34 [as of 1991]
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:62.4 tons [56.7 metric tons]
Inventory rating:28.7 tons [26.1 metric tons]
Sufficiency rating:82.8