RAMP A N.B. ON over GIRARD AVENUE
Map
Coordinates:
+39.97313, -75.1218039°58'23" N, 75°07'18" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | RAMP A N.B. ON over GIRARD AVENUE |
| Structure number: | 678011075007630 |
| Location: | GIRARD AVE.INTERC. 29B08 |
| Purpose: | Carries highway over highway |
| Route classification: | Collector (Urban) [17] |
| Length of largest span: | 69.9 ft. [21.3 m] |
| Total length: | 693.9 ft. [211.5 m] |
| Roadway width between curbs: | 25.9 ft. [7.9 m] |
| Deck width edge-to-edge: | 31.5 ft. [9.6 m] |
| Vertical clearance below bridge: | 16.4 ft. [5.0 m] |
| Skew angle: | 99° |
| Owner: | State Highway Agency [01] |
| Year built: | 1971 |
| Year reconstructed: | 1984 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | M 13.5 / H 15 [2] |
| Number of main spans: | 3 |
| Main spans material: | Steel continuous [4] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Latex Concrete or similar additive [3] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 19 [as of 2010] |
| Truck traffic: | 7% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Poor [4 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 51.9 tons [47.2 metric tons] |
| Inventory rating: | 30.9 tons [28.1 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 68.1 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 19 [as of 2000] |
| Truck traffic: | 7% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 60.4 tons [54.9 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 81.0 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $179,000 |