PR 971 over SANTIAGO RIVER

Map 

Coordinates:
+18.21833, -65.72833
18°13'06" N, 65°43'42" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:PR 971 over SANTIAGO RIVER
Structure number:005741
Location:1 KM NORTH OF NAGUABO
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:30.8 ft. [9.4 m]
Total length:30.8 ft. [9.4 m]
Roadway width between curbs:20.0 ft. [6.1 m]
Deck width edge-to-edge:23.3 ft. [7.1 m]
Owner:State Highway Agency [01]
Year built:1955
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Main span material:Steel [3]
Main span design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1,000 [as of 2005]
Truck traffic:4% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Serious [3 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. [4]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:34.4 tons [31.3 metric tons]
Inventory rating:38.1 tons [34.6 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:30.8
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$191,000

2000 Inspection 

Status:Open, posting recommended but not legally implemented [B]
Average daily traffic:1,000 [as of 1997]
Truck traffic:4% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. [4]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Operating rating:17.8 tons [16.2 metric tons]
Inventory rating:11.9 tons [10.8 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:16.3
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$280,000

1992 Inspection 

Status:Open, posting recommended but not legally implemented [B]
Average daily traffic:3,090 [as of 1987]
Truck traffic:4% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Poor [4 out of 9]
Channel protection:Bank protection has failed. River control devices have been destroyed. Stream bed aggradation, degradation or lateral movement has changed the channel to now threaten the bridge and/or approach roadway. [3]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:24.8 tons [22.5 metric tons]
Inventory rating:18.6 tons [16.9 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:29.8
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$588,000