OFF PR 123 over GRANDE DE ARECIBO RIVER

Map 

Coordinates:
+18.21833, -66.72667
18°13'06" N, 66°43'36" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:OFF PR 123 over GRANDE DE ARECIBO RIVER
Structure number:013551
Location:6 KM SOUTH OF UTUADO
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:18.0 ft. [5.5 m]
Total length:174.9 ft. [53.3 m]
Roadway width between curbs:24.3 ft. [7.4 m]
Deck width edge-to-edge:26.2 ft. [8.0 m]
Owner:City or Municipal Highway Agency [04]
Year built:1967
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Number of main spans:10
Main spans material:Concrete continuous [2]
Main spans design:Slab [01]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:250 [as of 2005]
Truck traffic:2% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Poor [4 out of 9]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4]
Evaluation:Structurally deficient [1]
Sufficiency rating:52.5
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$149,000

2000 Inspection 

Status:Open, posting recommended but not legally implemented [B]
Average daily traffic:250 [as of 1997]
Truck traffic:2% of total traffic
Deck condition:Critical [2 out of 9]
Superstructure condition:Critical [2 out of 9]
Substructure condition:Critical [2 out of 9]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Operating rating:17.8 tons [16.2 metric tons]
Inventory rating:13.9 tons [12.6 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:17.7
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$718,000

1992 Inspection 

Status:Open, posting recommended but not legally implemented [B]
Average daily traffic:420 [as of 1987]
Truck traffic:2% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. [4]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:26.7 tons [24.3 metric tons]
Inventory rating:24.8 tons [22.5 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:63.2
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$27,000