Facts 

Name:RI 114/103 CNTY RD over BARRINGTON RIVER
Structure number:000000000001230
Location:1.0 Mi W of JCT RI 136
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:64.0 ft. [19.5 m]
Total length:431.1 ft. [131.4 m]
Roadway width between curbs:29.9 ft. [9.1 m]
Deck width edge-to-edge:47.9 ft. [14.6 m]
Owner:State Highway Agency [01]
Year built:2009
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 22.5 / HS 25 [9]
Number of main spans:7
Main spans material:Prestressed concrete [5]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Precast Panels [2]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:26,000 [as of 2009]
Truck traffic:2% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:44.9 tons [40.8 metric tons]
Inventory rating:44.9 tons [40.8 metric tons]
Sufficiency rating:72.4
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$7,127,000

2000 Inspection 

Status:Bridge closed to all traffic [K]
Average daily traffic:20,000 [as of 1996]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Poor [4 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Operating rating:38.6 tons [35.1 metric tons]
Inventory rating:29.7 tons [27.0 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:38.5
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$6,366,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:10,300 [as of 1991]
Truck traffic:6% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Poor [4 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:32.2 tons [29.3 metric tons]
Inventory rating:24.8 tons [22.5 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:48.3
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$2,450,000