RI 117 WARWICK AV over PAWTUXET RIVER

Map 

Coordinates:
+41.76757, -71.40520
41°46'03" N, 71°24'19" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:RI 117 WARWICK AV over PAWTUXET RIVER
Structure number:000000000001500
Location:0.5 Mi S of JCT RI 12
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:53.2 ft. [16.2 m]
Total length:152.9 ft. [46.6 m]
Roadway width between curbs:51.8 ft. [15.8 m]
Deck width edge-to-edge:65.9 ft. [20.1 m]
Owner:State Highway Agency [01]
Year built:1921
Year reconstructed:1986
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Concrete [1]
Main spans design:Arch - Deck [11]
Deck type:Not applicable [N]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:21,904 [as of 1995]
Truck traffic:10% of total traffic
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Operating rating:49.9 tons [45.4 metric tons]
Inventory rating:29.9 tons [27.2 metric tons]
Sufficiency rating:55.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$1,692,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:20,900 [as of 1995]
Truck traffic:10% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Operating rating:89.1 tons [81.0 metric tons]
Inventory rating:53.5 tons [48.6 metric tons]
Sufficiency rating:60.3
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$1,692,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:17,150 [as of 1980]
Truck traffic:10% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:89.1 tons [81.0 metric tons]
Inventory rating:49.5 tons [45.0 metric tons]
Sufficiency rating:79.8