Share:

LANE H over MESH INTERCHANGE LANE A

Map 

Coordinates:
+41.73551, -71.48084
41°44'08" N, 71°28'51" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:LANE H over MESH INTERCHANGE LANE A
Structure number:000000000004240
Location:1.0 Mi N of JCT I-295
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:54.1 ft. [16.5 m]
Total length:56.1 ft. [17.1 m]
Roadway width between curbs:37.1 ft. [11.3 m]
Deck width edge-to-edge:44.3 ft. [13.5 m]
Vertical clearance below bridge:14.8 ft. [4.5 m]
Skew angle:33°
Owner:State Highway Agency [01]
Year built:1952
Year reconstructed:2002
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18 / HS 20 [5]
Main span material:Steel [3]
Main span design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:5,000 [as of 1992]
Truck traffic:10% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:12.3 tons [11.2 metric tons]
Inventory rating:73.8 tons [67.1 metric tons]
Sufficiency rating:94.5
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$38,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:5,000 [as of 1992]
Truck traffic:10% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Poor [4 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:97.0 tons [88.2 metric tons]
Inventory rating:67.3 tons [61.2 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:69.3
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$33,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:11,000 [as of 1974]
Truck traffic:10% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Poor [4 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:81.2 tons [73.8 metric tons]
Inventory rating:48.5 tons [44.1 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:68.0