Facts 

Name:RI 37 EASTBOUND over PAWTUXET RIVER
Structure number:000000000006280
Location:0.2 Mi W of JCT I-95
Purpose:Carries highway over waterway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:120.1 ft. [36.6 m]
Total length:259.9 ft. [79.2 m]
Roadway width between curbs:39.0 ft. [11.9 m]
Deck width edge-to-edge:44.9 ft. [13.7 m]
Skew angle:30°
Owner:State Highway Agency [01]
Year built:1963
Year reconstructed:1989
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:22,000 [as of 2006]
Truck traffic:10% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations (including piles) on dry land well above flood water elevations. [9]
Operating rating:92.8 tons [84.4 metric tons]
Inventory rating:55.9 tons [50.8 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:63.5
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$3,387,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:31,600 [as of 1992]
Truck traffic:10% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations (including piles) on dry land well above flood water elevations. [9]
Operating rating:92.1 tons [83.7 metric tons]
Inventory rating:55.4 tons [50.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:66.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:8,500 [as of 1973]
Truck traffic:10% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Poor [4 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:71.3 tons [64.8 metric tons]
Inventory rating:41.6 tons [37.8 metric tons]
Sufficiency rating:53.0