US 301 over S. EDISTO RIVER

Map 

Coordinates:
+33.33868, -81.01797
33°20'19" N, 81°01'05" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:US 301 over S. EDISTO RIVER
Structure number:000520030130400
Location:3MI N OF BAMBERG
Purpose:Carries highway over waterway
Route classification:Principal Arterial - Other (Rural) [02]
Length of largest span:43.0 ft. [13.1 m]
Total length:613.9 ft. [187.1 m]
Roadway width between curbs:39.4 ft. [12.0 m]
Deck width edge-to-edge:43.0 ft. [13.1 m]
Owner:State Highway Agency [01]
Year built:1952
Year reconstructed:1973
Historic significance:Historical significance is not determinable at this time [4]
Design load:M 13.5 / H 15 [2]
Number of main spans:25
Main spans material:Concrete [1]
Main spans design:Tee beam [04]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:3,100 [as of 2008]
Truck traffic:8% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Poor [4 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Operating rating:52.5 tons [47.7 metric tons]
Inventory rating:31.7 tons [28.8 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:65.3
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$900,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:2,900 [as of 1997]
Truck traffic:8% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Operating rating:52.8 tons [48.0 metric tons]
Inventory rating:31.9 tons [29.0 metric tons]
Sufficiency rating:87.8
Estimated cost of work:$396,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:2,406 [as of 1988]
Truck traffic:7% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:33.7 tons [30.6 metric tons]
Inventory rating:23.8 tons [21.6 metric tons]
Sufficiency rating:77.2
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$396,000