Share:

S-29-123 over FLAT CREEK

Map 

Coordinates:
+34.63666, -80.43523
34°38'12" N, 80°26'07" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:S-29-123 over FLAT CREEK
Structure number:002970012300100
Location:10.5MI NE KERSHAW
Purpose:Carries highway over waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:25.9 ft. [7.9 m]
Total length:53.2 ft. [16.2 m]
Roadway width between curbs:24.0 ft. [7.3 m]
Deck width edge-to-edge:27.6 ft. [8.4 m]
Owner:State Highway Agency [01]
Year built:1938
Historic significance:Historical significance is not determinable at this time [4]
Design load:M 9 / H 10 [1]
Number of main spans:2
Main spans material:Steel [3]
Main spans design:Arch - Deck [11]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:250 [as of 2008]
Truck traffic:5% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Poor [4 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:20.8 tons [18.9 metric tons]
Inventory rating:14.9 tons [13.5 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:32.6
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$308,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:380 [as of 1997]
Truck traffic:5% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:20.9 tons [19.0 metric tons]
Inventory rating:15.0 tons [13.6 metric tons]
Sufficiency rating:45.3
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$112,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:320 [as of 1988]
Truck traffic:4% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:20.8 tons [18.9 metric tons]
Inventory rating:14.9 tons [13.5 metric tons]
Sufficiency rating:44.4
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$112,000