NFA A417 over WORLEY FURNACE BRANCH
Map
Coordinates:
+36.07222, -87.4330636°04'20" N, 87°25'59" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | NFA A417 over WORLEY FURNACE BRANCH |
| Structure number: | 220A5090003 |
| Location: | 1 M. S. SR-1. |
| Purpose: | Carries highway over waterway |
| Route classification: | Local (Rural) [09] |
| Length of largest span: | 15.1 ft. [4.6 m] |
| Total length: | 23.0 ft. [7.0 m] |
| Roadway width between curbs: | 22.3 ft. [6.8 m] |
| Deck width edge-to-edge: | 24.3 ft. [7.4 m] |
| Skew angle: | 49° |
| Owner: | County Highway Agency [02] |
| Year built: | 1970 |
| Historic significance: | Historical significance is not determinable at this time [4] |
| Design load: | M 9 / H 10 [1] |
| Main span material: | Concrete [1] |
| Main span design: | Culvert [19] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 140 [as of 2010] |
| Truck traffic: | 2% of total traffic |
| Channel protection: | Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5] |
| Culvert condition: | Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. [7] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 39.6 tons [36.0 metric tons] |
| Inventory rating: | 26.7 tons [24.3 metric tons] |
| Sufficiency rating: | 78.4 |
| Recommended work: | Widening of existing bridge or other major structure without deck rehabilitation or replacement [33] |
| Estimated cost of work: | $61,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 140 [as of 1997] |
| Truck traffic: | 2% of total traffic |
| Channel protection: | Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. [4] |
| Culvert condition: | Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. [7] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 39.6 tons [36.0 metric tons] |
| Inventory rating: | 26.7 tons [24.3 metric tons] |
| Sufficiency rating: | 76.4 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $56,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 110 [as of 1978] |
| Truck traffic: | 2% of total traffic |
| Channel protection: | Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5] |
| Culvert condition: | Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. [6] |
| Scour condition: | Bridge is scour critical; bridge foundations determined to be unstable. [3] |
| Operating rating: | 36.6 tons [33.3 metric tons] |
| Inventory rating: | 26.7 tons [24.3 metric tons] |
| Sufficiency rating: | 75.2 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $39,000 |