FAU 319 over SOUTHERN RAILWAY

Map 

Coordinates:
+35.10361, -85.25472
35°06'13" N, 85°15'17" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:FAU 319 over SOUTHERN RAILWAY
Structure number:33006030015
Location:.5 MI. N. OF TN. RV.
Purpose:Carries highway over railroad
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:63.0 ft. [19.2 m]
Total length:189.0 ft. [57.6 m]
Roadway width between curbs:109.9 ft. [33.5 m]
Deck width edge-to-edge:111.9 ft. [34.1 m]
Vertical clearance below bridge:25.9 ft. [7.9 m]
Skew angle:14°
Owner:State Highway Agency [01]
Year built:1978
Historic significance:Historical significance is not determinable at this time [4]
Design load:M 18 / H 20 [4]
Number of main spans:3
Main spans material:Prestressed concrete continuous [6]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Precast Panels [2]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:27,470 [as of 2009]
Truck traffic:6% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:85.8

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:29,260 [as of 1998]
Truck traffic:6% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:85.0

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:22,090 [as of 1990]
Truck traffic:1% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:87.3
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$765,000