FAU 319 over FAU 3588 & E697

Map 

Coordinates:
+35.11667, -85.24833
35°07'00" N, 85°14'54" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:FAU 319 over FAU 3588 & E697
Structure number:33006030019
Location:1.4 MI. N. TENN. RIVER
Purpose:Carries highway over highway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:101.1 ft. [30.8 m]
Total length:172.9 ft. [52.7 m]
Roadway width between curbs:86.0 ft. [26.2 m]
Deck width edge-to-edge:87.9 ft. [26.8 m]
Vertical clearance below bridge:17.1 ft. [5.2 m]
Skew angle:
Owner:State Highway Agency [01]
Year built:1981
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18 / HS 20 [5]
Number of main spans:2
Main spans material:Prestressed concrete continuous [6]
Main spans design:Box Beam or girders - Single or Spread [06]
Deck type:Concrete Precast Panels [2]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:9,950 [as of 2009]
Truck traffic:6% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:94.2

2000 Inspection 

Average daily traffic:250 [as of 2000]
Truck traffic:2% of total traffic
Evaluation:Not applicable [N]

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:8,430 [as of 1990]
Truck traffic:1% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:94.8
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$554,000