FAP 29 over TN R/SOURR/FAU 5395&3619
Map
Coordinates:
+35.05472, -85.3150035°03'17" N, 85°18'54" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | FAP 29 over TN R/SOURR/FAU 5395&3619 |
| Structure number: | 33FA0271001 |
| Location: | SR-29 / TENN. RIVER |
| Purpose: | Carries highway over highway, waterway, and railroad |
| Route classification: | Principal Arterial - Other Freeways or Expressways (Urban) [12] |
| Length of largest span: | 375.0 ft. [114.3 m] |
| Total length: | 2745.2 ft. [836.7 m] |
| Roadway width between curbs: | 126.3 ft. [38.5 m] |
| Deck width edge-to-edge: | 129.9 ft. [39.6 m] |
| Vertical clearance below bridge: | 45.9 ft. [14.0 m] |
| Owner: | State Highway Agency [01] |
| Year built: | 1955 |
| Year reconstructed: | 2003 |
| Historic significance: | Historical significance is not determinable at this time [4] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 15 |
| Main spans material: | Steel continuous [4] |
| Main spans design: | Girder and floorbeam system [03] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 82,450 [as of 2009] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Pier/abutment protection: | None present but re-evaluation suggested [5] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 48.5 tons [44.1 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 84.0 |
2000 Inspection
| Average daily traffic: | 11,210 [as of 1998] |
| Truck traffic: | 5% of total traffic |
| Evaluation: | Not applicable [N] |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 41,080 [as of 1990] |
| Truck traffic: | 2% of total traffic |
| Deck condition: | Serious [3 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
| Pier/abutment protection: | None present but re-evaluation suggested [5] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 48.5 tons [44.1 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 72.0 |
| Recommended work: | Widening of existing bridge with deck rehabilitation or replacement. [34] |
| Estimated cost of work: | $14,733,000 |