FAP 29 over E.ELMWOOD & RR (A029)

Map 

Coordinates:
+35.07667, -85.32167
35°04'36" N, 85°19'18" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:FAP 29 over E.ELMWOOD & RR (A029)
Structure number:33FA0271007
Location:1.54 MI. N OF TN. RIVER
Purpose:Carries highway over highway and railroad
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:100.1 ft. [30.5 m]
Total length:242.1 ft. [73.8 m]
Roadway width between curbs:36.1 ft. [11.0 m]
Deck width edge-to-edge:41.7 ft. [12.7 m]
Vertical clearance below bridge:29.9 ft. [9.1 m]
Skew angle:39°
Owner:State Highway Agency [01]
Year built:1958
Historic significance:Historical significance is not determinable at this time [4]
Design load:M 18 / H 20 [4]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:63,040 [as of 2009]
Truck traffic:5% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:29.7 tons [27.0 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:66.7
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$1,312,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:39,780 [as of 1998]
Truck traffic:5% of total traffic
Deck condition:Serious [3 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:47.5 tons [43.2 metric tons]
Inventory rating:28.7 tons [26.1 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:65.0
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$430,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:25,080 [as of 1990]
Truck traffic:2% of total traffic
Deck condition:Serious [3 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:51.5 tons [46.8 metric tons]
Inventory rating:30.7 tons [27.9 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:66.1
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$603,000