Share:

I24 over SR 27 (ROSSVILLE BLVD.)

Map 

Coordinates:
+35.01833, -85.29389
35°01'06" N, 85°17'38" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I24 over SR 27 (ROSSVILLE BLVD.)
Structure number:33I00240035
Location:2 MI FROM SR58
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:73.2 ft. [22.3 m]
Total length:224.1 ft. [68.3 m]
Roadway width between curbs:136.2 ft. [41.5 m]
Deck width edge-to-edge:138.1 ft. [42.1 m]
Vertical clearance below bridge:15.1 ft. [4.6 m]
Skew angle:18°
Owner:State Highway Agency [01]
Year built:1961
Year reconstructed:1987
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:106,480 [as of 2009]
Truck traffic:14% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:51.5 tons [46.8 metric tons]
Inventory rating:30.7 tons [27.9 metric tons]
Sufficiency rating:73.9
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$4,882,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:102,160 [as of 1998]
Truck traffic:14% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:51.5 tons [46.8 metric tons]
Inventory rating:30.7 tons [27.9 metric tons]
Sufficiency rating:73.9
Recommended work:Bridge deck rehabilitation with only incidental widening. [36]
Estimated cost of work:$385,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:65,500 [as of 1990]
Truck traffic:11% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:95.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,143,000