I24 EBL over MISSIONARY RIDGE
Map
Coordinates:
+35.02000, -85.2650035°01'12" N, 85°15'54" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | I24 EBL over MISSIONARY RIDGE |
| Structure number: | 33I00240049 |
| Location: | 1.1 MI FROM SR17 |
| Route classification: | Principal Arterial - Interstate (Urban) [11] |
| Length of largest span: | 40.0 ft. [12.2 m] |
| Total length: | 339.9 ft. [103.6 m] |
| Roadway width between curbs: | 49.5 ft. [15.1 m] |
| Deck width edge-to-edge: | 51.5 ft. [15.7 m] |
| Owner: | State Highway Agency [01] |
| Year built: | 1965 |
| Historic significance: | Historical significance is not determinable at this time [4] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 9 |
| Main spans material: | Concrete [1] |
| Main spans design: | Tee beam [04] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 105,550 [as of 2009] |
| Truck traffic: | 15% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 62.4 tons [56.7 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 78.1 |
| Recommended work: | Widening of existing bridge or other major structure without deck rehabilitation or replacement [33] |
| Estimated cost of work: | $812,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 98,420 [as of 1998] |
| Truck traffic: | 15% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 62.4 tons [56.7 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 79.6 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $1,231,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 65,720 [as of 1990] |
| Truck traffic: | 11% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 38.6 tons [35.1 metric tons] |
| Inventory rating: | 26.7 tons [24.3 metric tons] |
| Sufficiency rating: | 80.0 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $4,608,000 |