Share:

FAU 4984 over S. CREST / I24 & E. MAIN

Map 

Coordinates:
+35.02194, -85.26111
35°01'19" N, 85°15'40" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:FAU 4984 over S. CREST / I24 & E. MAIN
Structure number:33I00240051
Location:S. CREST / I-24 & E. MAIN
Purpose:Carries highway over highway
Route classification:Collector (Urban) [17]
Length of largest span:154.9 ft. [47.2 m]
Total length:615.2 ft. [187.5 m]
Roadway width between curbs:24.0 ft. [7.3 m]
Deck width edge-to-edge:34.1 ft. [10.4 m]
Vertical clearance below bridge:40.0 ft. [12.2 m]
Owner:State Highway Agency [01]
Year built:1964
Historic significance:Historical significance is not determinable at this time [4]
Design load:M 18 / H 20 [4]
Number of main spans:5
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Low slump Concrete [4]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:790 [as of 2007]
Truck traffic:2% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:45.5 tons [41.4 metric tons]
Inventory rating:26.7 tons [24.3 metric tons]
Sufficiency rating:60.4
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$2,000

2000 Inspection 

Average daily traffic:98,420 [as of 1998]
Truck traffic:5% of total traffic
Evaluation:Not applicable [N]

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1,500 [as of 1979]
Truck traffic:2% of total traffic
Deck condition:Serious [3 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:69.3 tons [63.0 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:71.8
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,107,000