Share:

I24 over GERMANTOWN RD (FAU 3577)

Map 

Coordinates:
+35.01333, -85.25167
35°00'48" N, 85°15'06" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I24 over GERMANTOWN RD (FAU 3577)
Structure number:33I00240055
Location:IN CHATTANOOGA
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:45.9 ft. [14.0 m]
Total length:166.0 ft. [50.6 m]
Roadway width between curbs:78.1 ft. [23.8 m]
Deck width edge-to-edge:100.4 ft. [30.6 m]
Vertical clearance below bridge:14.4 ft. [4.4 m]
Skew angle:11°
Owner:State Highway Agency [01]
Year built:1965
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Concrete [1]
Main spans design:Tee beam [04]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:99,610 [as of 2009]
Truck traffic:15% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:51.5 tons [46.8 metric tons]
Inventory rating:30.7 tons [27.9 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:82.6

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:93,330 [as of 1998]
Truck traffic:15% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:51.5 tons [46.8 metric tons]
Inventory rating:30.7 tons [27.9 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:70.9
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$229,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:65,720 [as of 1990]
Truck traffic:11% of total traffic
Deck condition:Serious [3 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:73.0
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$291,000