Share:

I75 over STANDIFER GAP RD (E506)

Map 

Coordinates:
+35.05000, -85.14556
35°02'60" N, 85°08'44" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I75 over STANDIFER GAP RD (E506)
Structure number:33I00750051
Location:1.8 MI FM JERSEY PK
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:69.2 ft. [21.1 m]
Total length:132.2 ft. [40.3 m]
Roadway width between curbs:147.6 ft. [45.0 m]
Deck width edge-to-edge:153.6 ft. [46.8 m]
Vertical clearance below bridge:16.4 ft. [5.0 m]
Owner:State Highway Agency [01]
Year built:2004
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:3
Main spans material:Prestressed concrete continuous [6]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:79,220 [as of 2009]
Truck traffic:17% of total traffic
Deck condition:Excellent [9 out of 9]
Superstructure condition:Excellent [9 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:85.1 tons [77.4 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:85.1

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:69,500 [as of 1998]
Truck traffic:17% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:81.2 tons [73.8 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:79.0

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:44,020 [as of 1990]
Truck traffic:15% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:94.7
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$387,000