I124 over 19TH ST W. (FAU 5395)

Map 

Coordinates:
+35.03639, -85.31917
35°02'11" N, 85°19'09" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I124 over 19TH ST W. (FAU 5395)
Structure number:33I01240005
Location:1.5 MI OF I24
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:65.0 ft. [19.8 m]
Total length:227.0 ft. [69.2 m]
Roadway width between curbs:42.0 ft. [12.8 m]
Deck width edge-to-edge:48.2 ft. [14.7 m]
Vertical clearance below bridge:15.1 ft. [4.6 m]
Skew angle:31°
Owner:State Highway Agency [01]
Year built:1962
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:68,790 [as of 2009]
Truck traffic:5% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:60.4 tons [54.9 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:49.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$3,445,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:70,090 [as of 1998]
Truck traffic:5% of total traffic
Deck condition:Serious [3 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:72.3 tons [65.7 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:48.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,355,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:46,850 [as of 1990]
Truck traffic:2% of total traffic
Deck condition:Serious [3 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:54.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$833,000