Share:

I124 NBL over W.12TH ST (NFA 410)

Map 

Coordinates:
+35.04167, -85.31667
35°02'30" N, 85°19'00" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I124 NBL over W.12TH ST (NFA 410)
Structure number:33I01240011
Location:4.2 MI S OF TN RIVER
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:64.0 ft. [19.5 m]
Total length:148.0 ft. [45.1 m]
Roadway width between curbs:39.0 ft. [11.9 m]
Deck width edge-to-edge:50.2 ft. [15.3 m]
Vertical clearance below bridge:18.7 ft. [5.7 m]
Skew angle:
Owner:State Highway Agency [01]
Year built:1963
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:78,650 [as of 2009]
Truck traffic:5% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:70.3 tons [63.9 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:59.0
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$328,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:62,630 [as of 1998]
Truck traffic:5% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:65.3 tons [59.4 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:62.4
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$130,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:38,350 [as of 1990]
Truck traffic:2% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:52.5 tons [47.7 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:72.3
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$192,000