FAU 3605 over FRIAR BRANCH

Map 

Coordinates:
+35.04639, -85.20083
35°02'47" N, 85°12'03" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:FAU 3605 over FRIAR BRANCH
Structure number:33S43420001
Location:2 MI N OF SR2
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:28.9 ft. [8.8 m]
Total length:113.9 ft. [34.7 m]
Roadway width between curbs:27.9 ft. [8.5 m]
Deck width edge-to-edge:34.5 ft. [10.5 m]
Skew angle:15°
Owner:City or Municipal Highway Agency [04]
Year built:1955
Historic significance:Historical significance is not determinable at this time [4]
Design load:M 18 / H 20 [4]
Number of main spans:4
Main spans material:Concrete [1]
Main spans design:Tee beam [04]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:3,750 [as of 2007]
Truck traffic:4% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:50.5 tons [45.9 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:77.7
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$409,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:4,030 [as of 1998]
Truck traffic:4% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:50.5 tons [45.9 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:77.6
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$179,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:3,550 [as of 1990]
Truck traffic:1% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:91.1 tons [82.8 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:77.6
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$240,000