FAP 29 over SR 29 / NFA C592
Map
Coordinates:
+35.16667, -85.2816735°10'00" N, 85°16'54" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | FAP 29 over SR 29 / NFA C592 |
| Structure number: | 33SR0290081 |
| Location: | 2.57 MI. S OF SR-153 JCT. |
| Purpose: | Carries highway over highway |
| Route classification: | Principal Arterial - Other Freeways or Expressways (Urban) [12] |
| Length of largest span: | 69.9 ft. [21.3 m] |
| Total length: | 161.1 ft. [49.1 m] |
| Roadway width between curbs: | 42.0 ft. [12.8 m] |
| Deck width edge-to-edge: | 44.0 ft. [13.4 m] |
| Vertical clearance below bridge: | 14.8 ft. [4.5 m] |
| Skew angle: | 1° |
| Owner: | State Highway Agency [01] |
| Year built: | 1987 |
| Historic significance: | Historical significance is not determinable at this time [4] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 3 |
| Main spans material: | Prestressed concrete continuous [6] |
| Main spans design: | Box Beam or girders - Single or Spread [06] |
| Deck type: | Concrete Precast Panels [2] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 19,760 [as of 2009] |
| Truck traffic: | 4% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 70.3 tons [63.9 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 98.1 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 19,040 [as of 1998] |
| Truck traffic: | 4% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 48.5 tons [44.1 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 94.1 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 10,420 [as of 1990] |
| Truck traffic: | 1% of total traffic |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 48.5 tons [44.1 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 97.2 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $507,000 |