Share:

FAU 58 350112N over CSX RAILROAD

Map 

Coordinates:
+35.01472, -85.31417
35°00'53" N, 85°18'51" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:FAU 58 350112N over CSX RAILROAD
Structure number:33SR0580003
Location:1.0 MI. S OF I-24 JCT.
Purpose:Carries highway over railroad
Route classification:Minor Arterial (Urban) [16]
Length of largest span:36.1 ft. [11.0 m]
Total length:80.1 ft. [24.4 m]
Roadway width between curbs:37.1 ft. [11.3 m]
Deck width edge-to-edge:48.9 ft. [14.9 m]
Vertical clearance below bridge:20.0 ft. [6.1 m]
Owner:State Highway Agency [01]
Year built:1920
Historic significance:Historical significance is not determinable at this time [4]
Number of main spans:3
Main spans material:Concrete continuous [2]
Main spans design:Slab [01]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:9,210 [as of 2009]
Truck traffic:12% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:39.6 tons [36.0 metric tons]
Inventory rating:24.8 tons [22.5 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:45.5
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,187,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:13,860 [as of 1998]
Truck traffic:12% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:39.6 tons [36.0 metric tons]
Inventory rating:26.7 tons [24.3 metric tons]
Sufficiency rating:62.8
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$467,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:10,670 [as of 1990]
Truck traffic:3% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:38.6 tons [35.1 metric tons]
Inventory rating:26.7 tons [24.3 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:58.7
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$282,000