NFA A396 over MABEL ST (NFA A396)
Map
Coordinates:
+35.05111, -85.2994435°03'04" N, 85°17'58" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | NFA A396 over MABEL ST (NFA A396) |
| Structure number: | 33SR0580009 |
| Location: | 0.7 MI. E OF SR-8 JCT. |
| Purpose: | Carries highway over highway |
| Route classification: | Other Principal Arterial (Urban) [14] |
| Length of largest span: | 65.9 ft. [20.1 m] |
| Total length: | 148.0 ft. [45.1 m] |
| Roadway width between curbs: | 87.9 ft. [26.8 m] |
| Deck width edge-to-edge: | 89.9 ft. [27.4 m] |
| Vertical clearance below bridge: | 16.4 ft. [5.0 m] |
| Skew angle: | 4° |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 1971 |
| Historic significance: | Historical significance is not determinable at this time [4] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 3 |
| Main spans material: | Prestressed concrete continuous [6] |
| Main spans design: | Box Beam or girders - Single or Spread [06] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 15,750 [as of 2007] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 57.4 tons [52.2 metric tons] |
| Inventory rating: | 34.7 tons [31.5 metric tons] |
| Sufficiency rating: | 83.4 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 17,670 [as of 1998] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 57.4 tons [52.2 metric tons] |
| Inventory rating: | 34.7 tons [31.5 metric tons] |
| Sufficiency rating: | 82.9 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 17,980 [as of 1990] |
| Truck traffic: | 2% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 48.5 tons [44.1 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 84.2 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $489,000 |