Facts 

Name:FAU 17 over CHICKAMAUGA CREEK
Structure number:33SR0580013
Location:0.72 MI. W OF SR-153 JCT.
Purpose:Carries highway over waterway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:162.1 ft. [49.4 m]
Total length:420.0 ft. [128.0 m]
Roadway width between curbs:40.0 ft. [12.2 m]
Deck width edge-to-edge:43.3 ft. [13.2 m]
Vertical clearance above deck:16.4 ft. [5.0 m]
Owner:State Highway Agency [01]
Year built:1929
Historic significance:Historical significance is not determinable at this time [4]
Design load:M 13.5 / H 15 [2]
Main span material:Steel [3]
Main span design:Truss - Thru [10]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:17,420 [as of 2009]
Truck traffic:3% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:39.6 tons [36.0 metric tons]
Inventory rating:26.7 tons [24.3 metric tons]
Sufficiency rating:58.5
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$5,644,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:19,030 [as of 1998]
Truck traffic:3% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:39.6 tons [36.0 metric tons]
Inventory rating:26.7 tons [24.3 metric tons]
Sufficiency rating:59.5
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$1,567,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:15,800 [as of 1990]
Truck traffic:1% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:76.2 tons [69.3 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:64.0
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$1,008,000