Share:

FAP 153 over HICKORY VALLEY ROAD

Map 

Coordinates:
+35.02778, -85.17611
35°01'40" N, 85°10'34" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:FAP 153 over HICKORY VALLEY ROAD
Structure number:33SR1530004
Location:0.44 MI. N OF I-75 JCT.
Purpose:Carries highway over highway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:54.1 ft. [16.5 m]
Total length:124.0 ft. [37.8 m]
Roadway width between curbs:76.1 ft. [23.2 m]
Deck width edge-to-edge:78.1 ft. [23.8 m]
Vertical clearance below bridge:14.8 ft. [4.5 m]
Skew angle:
Owner:State Highway Agency [01]
Year built:1959
Year reconstructed:2001
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Prestressed concrete continuous [6]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:70,250 [as of 2009]
Truck traffic:10% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:51.5 tons [46.8 metric tons]
Inventory rating:30.7 tons [27.9 metric tons]
Sufficiency rating:93.5

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:65,600 [as of 1998]
Truck traffic:10% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:81.2 tons [73.8 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:77.2
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$158,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:51,810 [as of 1990]
Truck traffic:6% of total traffic
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:81.0
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$129,000