NFA A106 over FIRST CREEK

Map 

Coordinates:
+35.99667, -83.92472
35°59'48" N, 83°55'29" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:NFA A106 over FIRST CREEK
Structure number:470A1060001
Location:W OFF US441-N OF WOODLAND
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Local (Urban) [19]
Length of largest span:49.9 ft. [15.2 m]
Total length:53.2 ft. [16.2 m]
Roadway width between curbs:29.9 ft. [9.1 m]
Deck width edge-to-edge:49.9 ft. [15.2 m]
Owner:City or Municipal Highway Agency [04]
Year built:1920
Year reconstructed:1988
Historic significance:Historical significance is not determinable at this time [4]
Main span material:Concrete [1]
Main span design:Arch - Deck [11]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:5,380 [as of 2010]
Truck traffic:2% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:39.6 tons [36.0 metric tons]
Inventory rating:26.7 tons [24.3 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:72.8
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,075,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:3,120 [as of 2000]
Truck traffic:2% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:39.6 tons [36.0 metric tons]
Inventory rating:26.7 tons [24.3 metric tons]
Sufficiency rating:73.1
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$79,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:3,120 [as of 1978]
Truck traffic:2% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:36.6 tons [33.3 metric tons]
Inventory rating:26.7 tons [24.3 metric tons]
Sufficiency rating:72.2
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$165,000