I40 over I40 / ASHEVILLE HWY.
Map
Coordinates:
+36.01028, -83.8419436°00'37" N, 83°50'31" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | I40 over I40 / ASHEVILLE HWY. |
| Structure number: | 47I00400093 |
| Location: | 1.4 M SE OF HOLSTON DR |
| Purpose: | Carries highway over highway |
| Route classification: | Principal Arterial - Interstate (Urban) [11] |
| Length of largest span: | 51.8 ft. [15.8 m] |
| Total length: | 192.9 ft. [58.8 m] |
| Roadway width between curbs: | 111.9 ft. [34.1 m] |
| Deck width edge-to-edge: | 113.9 ft. [34.7 m] |
| Vertical clearance below bridge: | 14.8 ft. [4.5 m] |
| Skew angle: | 31° |
| Owner: | State Highway Agency [01] |
| Year built: | 1967 |
| Historic significance: | Historical significance is not determinable at this time [4] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 4 |
| Main spans material: | Prestressed concrete continuous [6] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 90,900 [as of 2009] |
| Truck traffic: | 24% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 64.4 tons [58.5 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 71.0 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $3,334,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 69,460 [as of 1999] |
| Truck traffic: | 24% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 64.4 tons [58.5 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 70.0 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $2,042,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 72,000 [as of 1991] |
| Truck traffic: | 17% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 48.5 tons [44.1 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 70.0 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $807,000 |