I40 RMP over I40-WB-RMP / 2 RTS.

Map 

Coordinates:
+35.96333, -83.94333
35°57'48" N, 83°56'36" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I40 RMP over I40-WB-RMP / 2 RTS.
Structure number:47I00400125
Location:IN KNOXVILLE
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:138.1 ft. [42.1 m]
Total length:376.0 ft. [114.6 m]
Roadway width between curbs:42.0 ft. [12.8 m]
Deck width edge-to-edge:44.0 ft. [13.4 m]
Vertical clearance below bridge:17.1 ft. [5.2 m]
Owner:State Highway Agency [01]
Year built:1980
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:16,360 [as of 2010]
Truck traffic:10% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:71.3 tons [64.8 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:90.4

2000 Inspection 

Average daily traffic:2,000 [as of 2000]
Truck traffic:2% of total traffic
Evaluation:Not applicable [N]

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:89,000 [as of 1991]
Truck traffic:6% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:91.3
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,185,000