Facts 

Name:I40 RMP over I40-EB-FLYOVER / 3 RTS.
Structure number:47I00400135
Location:AT I-40 & I-640 JCT.
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:191.9 ft. [58.5 m]
Total length:1235.0 ft. [376.4 m]
Roadway width between curbs:42.0 ft. [12.8 m]
Deck width edge-to-edge:44.0 ft. [13.4 m]
Vertical clearance below bridge:18.4 ft. [5.6 m]
Owner:State Highway Agency [01]
Year built:1982
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:7
Main spans material:Steel continuous [4]
Main spans design:Box Beam or girders - Single or Spread [06]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:87,900 [as of 2009]
Truck traffic:16% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:84.0

2000 Inspection 

Average daily traffic:74,790 [as of 1999]
Truck traffic:2% of total traffic
Evaluation:Not applicable [N]

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:52,850 [as of 1991]
Truck traffic:9% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:85.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$3,891,000