Share:

NFA A075 RL over BAXTER AVE-RL / I275

Map 

Coordinates:
+35.97667, -83.93500
35°58'36" N, 83°56'06" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:NFA A075 RL over BAXTER AVE-RL / I275
Structure number:47I02750005
Location:BAXTER AVE
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Local (Urban) [19]
Length of largest span:49.5 ft. [15.1 m]
Total length:219.8 ft. [67.0 m]
Roadway width between curbs:25.9 ft. [7.9 m]
Deck width edge-to-edge:35.1 ft. [10.7 m]
Vertical clearance below bridge:14.8 ft. [4.5 m]
Owner:State Highway Agency [01]
Year built:1959
Year reconstructed:1992
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Concrete [1]
Main spans design:Tee beam [04]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:9,010 [as of 2010]
Truck traffic:2% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:58.4 tons [53.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:60.4
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$2,389,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:11,660 [as of 2000]
Truck traffic:2% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:58.4 tons [53.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:69.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$604,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:100 [as of 1989]
Truck traffic:1% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Serious [3 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:74.2 tons [67.5 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:46.9
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$429,000