FAU 3789 over RL-HEISKELL AVE. / I275
Map
Coordinates:
+35.99111, -83.9516735°59'28" N, 83°57'06" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | FAU 3789 over RL-HEISKELL AVE. / I275 |
| Structure number: | 47I02750011 |
| Location: | 0.6 MI S. OF SHARPS GAP |
| Purpose: | Carries highway and pedestrian walkway over highway |
| Route classification: | Collector (Urban) [17] |
| Length of largest span: | 55.1 ft. [16.8 m] |
| Total length: | 273.3 ft. [83.3 m] |
| Roadway width between curbs: | 38.4 ft. [11.7 m] |
| Deck width edge-to-edge: | 47.2 ft. [14.4 m] |
| Vertical clearance below bridge: | 15.4 ft. [4.7 m] |
| Skew angle: | 24° |
| Owner: | State Highway Agency [01] |
| Year built: | 1959 |
| Historic significance: | Historical significance is not determinable at this time [4] |
| Design load: | M 18 / H 20 [4] |
| Number of main spans: | 6 |
| Main spans material: | Concrete [1] |
| Main spans design: | Tee beam [04] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 11,480 [as of 2007] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 46.5 tons [42.3 metric tons] |
| Inventory rating: | 27.7 tons [25.2 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 74.3 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $2,213,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 16,150 [as of 1999] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 48.5 tons [44.1 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 91.4 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 16,060 [as of 1991] |
| Truck traffic: | 1% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Serious [3 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 48.5 tons [44.1 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 48.2 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $779,000 |