Facts 

Name:FAU 1 over NORTH FORK TURKEY CREEK
Structure number:47SR0010003
Location:IN FARRAGUT
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:25.9 ft. [7.9 m]
Total length:33.8 ft. [10.3 m]
Roadway width between curbs:52.2 ft. [15.9 m]
Deck width edge-to-edge:83.0 ft. [25.3 m]
Owner:State Highway Agency [01]
Year built:1939
Historic significance:Historical significance is not determinable at this time [4]
Design load:M 13.5 / H 15 [2]
Main span material:Concrete [1]
Main span design:Culvert [19]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: November 2015 

Status:Open, no restriction [A]
Average daily traffic:23,850 [as of 2015]
Truck traffic:3% of total traffic
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Culvert condition:Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:39.6 tons [36.0 metric tons]
Inventory rating:26.7 tons [24.3 metric tons]
Sufficiency rating:59.5
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$2,000

Previous Inspections 

DateSuff. ratingEvaluationDeckSuper.Sub.ADT
November 201559.5Not deficient---23850
November 201359.5Not deficient---22560
December 201159.5Not deficient---18220
January 201057.5Not deficient---19270
January 200858.5Not deficient---19640
January 200660.5Not deficient---19530
January 200460.5Not deficient---19260
October 200160.5Not deficient---16900
November 199960.5Not deficient---37500
January 199860.5Not deficient---46400
September 199561.5Not deficient---37150
October 199361.5Not deficient---29800
November 199161.5Not deficient---28900
January 199061.5Not deficient---28900