Share:

FAP 33 over FIRST CREEK

Map 

Coordinates:
+36.00444, -83.92667
36°00'16" N, 83°55'36" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:FAP 33 over FIRST CREEK
Structure number:47SR0330021
Location:3.1 M SE OF KNOXVILLE
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:28.2 ft. [8.6 m]
Total length:56.8 ft. [17.3 m]
Roadway width between curbs:54.5 ft. [16.6 m]
Deck width edge-to-edge:66.3 ft. [20.2 m]
Skew angle:15°
Owner:State Highway Agency [01]
Year built:1936
Historic significance:Historical significance is not determinable at this time [4]
Design load:M 13.5 / H 15 [2]
Number of main spans:2
Main spans material:Concrete [1]
Main spans design:Tee beam [04]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:25,070 [as of 2009]
Truck traffic:3% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:54.5 tons [49.5 metric tons]
Inventory rating:32.7 tons [29.7 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:61.6
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,399,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:26,430 [as of 1999]
Truck traffic:3% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:54.5 tons [49.5 metric tons]
Inventory rating:32.7 tons [29.7 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:60.6
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$553,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:26,260 [as of 1991]
Truck traffic:1% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:86.1 tons [78.3 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:51.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$206,000