Facts 

Name:FAU 2810 over NONCONNAH CREEK
Structure number:79028100001
Location:AIRWAYS BLVD. & I-240 JCT
Purpose:Carries highway over waterway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:103.0 ft. [31.4 m]
Total length:523.0 ft. [159.4 m]
Roadway width between curbs:54.1 ft. [16.5 m]
Deck width edge-to-edge:56.1 ft. [17.1 m]
Skew angle:30°
Owner:State Highway Agency [01]
Year built:1958
Year reconstructed:1974
Historic significance:Historical significance is not determinable at this time [4]
Design load:M 18 / H 20 [4]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:49,190 [as of 2007]
Truck traffic:6% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Countermeasures have been installed to mitigate an existing problem with scour. [7]
Operating rating:49.5 tons [45.0 metric tons]
Inventory rating:29.7 tons [27.0 metric tons]
Sufficiency rating:60.9
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$4,994,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:71,530 [as of 1999]
Truck traffic:6% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Countermeasures have been installed to mitigate an existing problem with scour. [7]
Operating rating:49.5 tons [45.0 metric tons]
Inventory rating:29.7 tons [27.0 metric tons]
Sufficiency rating:63.9
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$1,963,000