Facts 

Name:FAU 2863 over NONCONNAH CREEK
Structure number:79028630003
Location:MILL BRANCH RD - MEMPHIS
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:101.1 ft. [30.8 m]
Total length:464.9 ft. [141.7 m]
Roadway width between curbs:96.1 ft. [29.3 m]
Deck width edge-to-edge:120.1 ft. [36.6 m]
Owner:City or Municipal Highway Agency [04]
Year built:1985
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18 / HS 20 [5]
Number of main spans:5
Main spans material:Prestressed concrete continuous [6]
Main spans design:Box Beam or girders - Single or Spread [06]
Deck type:Concrete Precast Panels [2]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: June 2015 

Status:Open, no restriction [A]
Average daily traffic:24,520 [as of 2016]
Truck traffic:3% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Equal to present minimum criteria [6]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Countermeasures have been installed to mitigate an existing problem with scour. [7]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:74.0
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$1,883,000

Previous Inspections 

DateSuff. ratingEvaluationDeckSuper.Sub.ADT
June 201574.0Not deficientFairGoodGood24520
May 201374.0Not deficientFairGoodGood24520
July 201174.0Not deficientFairGoodGood24520
July 200974.0Not deficientFairGoodGood24520
August 200775.0Not deficientSatisfactoryGoodGood24520
July 200575.0Not deficientSatisfactoryGoodGood24910
August 200375.0Not deficientGoodGoodGood24990
August 200175.0Not deficientGoodGoodGood29790
October 199978.0Not deficientGoodVery GoodGood30730
May 199875.0Not deficientGoodVery GoodGood29300
June 199851.0Structurally deficientGoodVery GoodPoor30270
December 199567.0Not deficientGoodVery GoodFair29370
October 199367.0Not deficientGoodVery GoodFair28320
December 199178.0Not deficientGoodVery GoodVery Good28140