Share:

FAU 5200 348588M over CSX RR (ABAND)

Map 

Coordinates:
+35.13889, -89.95167
35°08'20" N, 89°57'06" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:FAU 5200 348588M over CSX RR (ABAND)
Structure number:790B6370001
Location:HOLMES ST - MEMPHIS
Purpose:Carries highway and pedestrian walkway over railroad
Route classification:Minor Arterial (Urban) [16]
Length of largest span:36.1 ft. [11.0 m]
Total length:104.0 ft. [31.7 m]
Roadway width between curbs:47.9 ft. [14.6 m]
Deck width edge-to-edge:62.3 ft. [19.0 m]
Vertical clearance below bridge:19.7 ft. [6.0 m]
Skew angle:
Owner:City or Municipal Highway Agency [04]
Year built:1949
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:7,370 [as of 2007]
Truck traffic:2% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:43.6 tons [39.6 metric tons]
Inventory rating:25.7 tons [23.4 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:34.4
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$2,033,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:9,590 [as of 1999]
Truck traffic:2% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:61.8
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$799,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:12,000 [as of 1978]
Truck traffic:2% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. [4]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:75.7
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$279,000