NFA K370 over CYPRESS CREEK
Map
Coordinates:
+35.15861, -89.9691735°09'31" N, 89°58'09" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | NFA K370 over CYPRESS CREEK |
| Structure number: | 790B6790001 |
| Location: | JACKSON AVE - MEMPHIS |
| Purpose: | Carries highway and pedestrian walkway over waterway |
| Route classification: | Local (Urban) [19] |
| Length of largest span: | 94.2 ft. [28.7 m] |
| Total length: | 97.8 ft. [29.8 m] |
| Roadway width between curbs: | 22.0 ft. [6.7 m] |
| Deck width edge-to-edge: | 29.9 ft. [9.1 m] |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 1999 |
| Historic significance: | Historical significance is not determinable at this time [4] |
| Design load: | MS 18 / HS 20 [5] |
| Main span material: | Prestressed concrete [5] |
| Main span design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 320 [as of 2010] |
| Truck traffic: | 2% of total traffic |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 48.5 tons [44.1 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 80.5 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 600 [as of 2000] |
| Truck traffic: | 2% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 39.6 tons [36.0 metric tons] |
| Inventory rating: | 26.7 tons [24.3 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 70.4 |
| Recommended work: | Widening of existing bridge with deck rehabilitation or replacement. [34] |
| Estimated cost of work: | $98,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 600 [as of 1978] |
| Truck traffic: | 2% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 48.5 tons [44.1 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 81.9 |
| Recommended work: | Widening of existing bridge with deck rehabilitation or replacement. [34] |
| Estimated cost of work: | $137,000 |