Facts 

Name:FAU 4196 over DITCH
Structure number:790M0100001
Location:WEAVER RD - MEMPHIS
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:70.9 ft. [21.6 m]
Total length:72.5 ft. [22.1 m]
Roadway width between curbs:64.0 ft. [19.5 m]
Deck width edge-to-edge:78.1 ft. [23.8 m]
Owner:City or Municipal Highway Agency [04]
Year built:1998
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18 / HS 20 [5]
Main span material:Prestressed concrete [5]
Main span design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:5,850 [as of 2007]
Truck traffic:3% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:88.4

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:6,330 [as of 1999]
Truck traffic:3% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:86.8

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:8,290 [as of 1991]
Truck traffic:1% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. [4]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:36.6 tons [33.3 metric tons]
Inventory rating:26.7 tons [24.3 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:55.5
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$66,000