I40-RL 309166N over I40-RL / IC RAILROAD

Map 

Coordinates:
+35.19056, -89.96444
35°11'26" N, 89°57'52" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I40-RL 309166N over I40-RL / IC RAILROAD
Structure number:79I00400077
Location:3 MI E OF SR 300 JCT
Purpose:Carries highway over railroad
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:54.1 ft. [16.5 m]
Total length:164.1 ft. [50.0 m]
Roadway width between curbs:60.0 ft. [18.3 m]
Deck width edge-to-edge:62.0 ft. [18.9 m]
Vertical clearance below bridge:22.3 ft. [6.8 m]
Owner:State Highway Agency [01]
Year built:1976
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:3
Main spans material:Prestressed concrete continuous [6]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:93,570 [as of 2009]
Truck traffic:10% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:82.2 tons [74.7 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:93.6

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:83,440 [as of 1999]
Truck traffic:10% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:88.2

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:68,460 [as of 1991]
Truck traffic:7% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:92.9
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$717,000