Facts 

Name:FAS 177 over I-40
Structure number:79I00400117
Location:SR-177 / I-40
Purpose:Carries highway over highway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:158.8 ft. [48.4 m]
Total length:286.8 ft. [87.4 m]
Roadway width between curbs:124.0 ft. [37.8 m]
Deck width edge-to-edge:140.1 ft. [42.7 m]
Vertical clearance below bridge:16.7 ft. [5.1 m]
Skew angle:30°
Owner:State Highway Agency [01]
Year built:1988
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18 / HS 20 [5]
Number of main spans:2
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Precast Panels [2]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:37,280 [as of 2009]
Truck traffic:6% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:79.2 tons [72.0 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:82.0

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:41,710 [as of 1999]
Truck traffic:6% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:79.2 tons [72.0 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:80.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$3,061,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:27,750 [as of 1991]
Truck traffic:1% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:84.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$776,000