I55 NB over NONCONNAH CREEK
Map
Coordinates:
+35.06528, -90.0241735°03'55" N, 90°01'27" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | I55 NB over NONCONNAH CREEK |
| Structure number: | 79I00550031 |
| Location: | .5 MI S OF I240 JCT |
| Purpose: | Carries highway over waterway |
| Route classification: | Principal Arterial - Interstate (Urban) [11] |
| Length of largest span: | 142.1 ft. [43.3 m] |
| Total length: | 638.2 ft. [194.5 m] |
| Roadway width between curbs: | 71.9 ft. [21.9 m] |
| Deck width edge-to-edge: | 79.7 ft. [24.3 m] |
| Skew angle: | 48° |
| Owner: | State Highway Agency [01] |
| Year built: | 1962 |
| Year reconstructed: | 2001 |
| Historic significance: | Historical significance is not determinable at this time [4] |
| Design load: | MS 18+Mod / HS 20+Mod [6] |
| Number of main spans: | 6 |
| Main spans material: | Steel continuous [4] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 103,650 [as of 2009] |
| Truck traffic: | 13% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 50.5 tons [45.9 metric tons] |
| Inventory rating: | 30.7 tons [27.9 metric tons] |
| Sufficiency rating: | 87.9 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 56,600 [as of 1999] |
| Truck traffic: | 13% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 50.5 tons [45.9 metric tons] |
| Inventory rating: | 30.7 tons [27.9 metric tons] |
| Sufficiency rating: | 77.9 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $2,905,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 87,700 [as of 1991] |
| Truck traffic: | 7% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 48.5 tons [44.1 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 85.0 |
| Recommended work: | Widening of existing bridge with deck rehabilitation or replacement. [34] |
| Estimated cost of work: | $3,537,000 |