Facts 

Name:I55 over I240 / I55
Structure number:79I00550038
Location:I55 & I240 JCT
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:81.0 ft. [24.7 m]
Total length:232.0 ft. [70.7 m]
Roadway width between curbs:65.9 ft. [20.1 m]
Deck width edge-to-edge:67.9 ft. [20.7 m]
Vertical clearance below bridge:17.1 ft. [5.2 m]
Owner:State Highway Agency [01]
Year built:1958
Year reconstructed:1998
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:2
Main spans material:Prestressed concrete continuous [6]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:95,930 [as of 2009]
Truck traffic:6% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:81.0

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:72,030 [as of 1999]
Truck traffic:6% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:28.7 tons [26.1 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:57.9
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,699,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:87,700 [as of 1991]
Truck traffic:7% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:77.0
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$501,000