Share:

I55-LL 297766D over ICG RAILROAD

Map 

Coordinates:
+35.07639, -90.04417
35°04'35" N, 90°02'39" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I55-LL 297766D over ICG RAILROAD
Structure number:79I00550048
Location:1 MI W OF I240 JCT
Purpose:Carries highway over railroad
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:117.1 ft. [35.7 m]
Total length:521.0 ft. [158.8 m]
Roadway width between curbs:42.0 ft. [12.8 m]
Deck width edge-to-edge:47.6 ft. [14.5 m]
Vertical clearance below bridge:22.3 ft. [6.8 m]
Skew angle:62°
Owner:State Highway Agency [01]
Year built:1963
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:5
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:87,000 [as of 2009]
Truck traffic:24% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:59.4 tons [54.0 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:59.7
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$1,937,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:80,790 [as of 1999]
Truck traffic:24% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:59.4 tons [54.0 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:68.2
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$2,243,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:66,170 [as of 1991]
Truck traffic:7% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge not over waterway. [N]
Operating rating:61.4 tons [55.8 metric tons]
Inventory rating:32.7 tons [29.7 metric tons]
Sufficiency rating:83.0
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$1,102,000